Question: Show me the steps to solve d ) During a flood, the water level in the channel in Figure Q 1 ( d ) exceeded

Show me the steps to solve d) During a flood, the water level in the channel in Figure Q1(d) exceeded the bank full level of 3.0 m . The flood bank has a bottom width of 12 m , located to the left of the main channel and it is grassed with side slope of 1V:3H. The estimated Manning's coefficient, n for the flood bank is 0.035. The main channel has a roughness coefficient, n of 0.015 and bottom width of 10 m , with a levee on its right and left at a side slope of 1V:2H, both sides. Survey measurements indicate the upstream elevation of the channel is 36.5 m and the downstream elevation of the channel is 35.5 m , with the distance of 1 km between both points. Solve for the total discharge for the compound channel. (CO1-PO1-C3)
i want the answer of this Q
Show me the steps to solve d ) During a flood,

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!