Question: show working.... Observed Time (min) 0.69 Element and Description 1. Pick up mechanism plate from rack and place in fixture 2. Assemble motor and fasteners

show working.... Observed Time (min) 0.69 Element

show working....

Observed Time (min) 0.69 Element and Description 1. Pick up mechanism plate from rack and place in fixture 2. Assemble motor and fasteners to front side of plate 3. Move to other side of plate 4. Assemble two brackets to plate 0.99 1.15 0.67 5. Assemble hub mechanism to brackets 0.97 6. Remove plate from fixture and place in rack 0.62 The reading in the table above were taken by the snapback timing method of direct time study to produce a certain subassembly. The task was performance rated at 80%. In addition to the above regular elements, an irregular element must be included in the standard: each rack holds 6 mechanism plates and has universal wheels for easy movement. After completing 6 subassemblies, the operator must move the rack (which now holds the subassemblies) to the aisle and then move a new empty rack into position at the workstation. This irregular element was timed at 2.93 min with the same previous performance rating. The PFD allowance is 10%. Determine the standard time for the cycle. 6.14 minutes O 4.48 minutes O 4.46 minutes O 4.91 minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!