Question: Simulation 80% 9196 Rework Part A Prep Scrapped Part A Salvaged EXP015) Sealer and TRIA(1.4,8) EXPO(45) Shipped Arrivals Part B Prep Pat A Part B

Simulation Simulation 80% 9196 Rework Part A Prep Scrapped
80% 9196 Rework Part A Prep Scrapped Part A Salvaged EXP015) Sealer and TRIA(1.4,8) EXPO(45) Shipped Arrivals Part B Prep Pat A Part B TRIA(1,3,4) Shipped Batches 4 Part EXPO(30) WEB(2553) TRIA(3,5,10) Figure 4-1. Electronic Assembly and Test System is then sent to the final production area we are modeling. The time between the arrivals of successive batches of Part B to our model is exponential with a mean of 30 minutes. Upon arrival at the Part B Prep area, the batch is separated into the four individual units, which are processed individually from here on, and the individual parts proceed (in- stantly) to the Part B Prep area. The processing at the Part B Prep area has the same three steps as at the Part A Prep area, except that the process time for the combined operation follows a TRIA(3,5.10) distribution. The part is then sent instantly) to the sealer. At the sealer operation, the electronic components are inserted, the case is assem- bled and sealed. and the sealed unit is tested. The total process time for these operations depeneconcos you or A and WEIB(2.5.5.3) for Part B (2.5 is the sentenarmatand the Danmalar See Annandi. Nimetana 80% 9196 Rework Part A Prep Scrapped Part A Salvaged EXP015) Sealer and TRIA(1.4,8) EXPO(45) Shipped Arrivals Part B Prep Pat A Part B TRIA(1,3,4) Shipped Batches 4 Part EXPO(30) WEB(2553) TRIA(3,5,10) Figure 4-1. Electronic Assembly and Test System is then sent to the final production area we are modeling. The time between the arrivals of successive batches of Part B to our model is exponential with a mean of 30 minutes. Upon arrival at the Part B Prep area, the batch is separated into the four individual units, which are processed individually from here on, and the individual parts proceed (in- stantly) to the Part B Prep area. The processing at the Part B Prep area has the same three steps as at the Part A Prep area, except that the process time for the combined operation follows a TRIA(3,5.10) distribution. The part is then sent instantly) to the sealer. At the sealer operation, the electronic components are inserted, the case is assem- bled and sealed. and the sealed unit is tested. The total process time for these operations depeneconcos you or A and WEIB(2.5.5.3) for Part B (2.5 is the sentenarmatand the Danmalar See Annandi. Nimetana

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!