Question: System Description: DEVELOP THIS USING ARENA SIMULATION AND INCLUDE EVERY STEP WITH BASIC MODULES In a sequential production line within an assembly facility, components of
System Description:
DEVELOP THIS USING ARENA SIMULATION AND INCLUDE EVERY STEP WITH BASIC MODULES
In a sequential production line within an assembly facility, components of parts with singular type arrive according to a predetermined schedule as outlined in the subsequent table. These components must sequentially undergo three distinct processes, specifically: drilling, threading, and coating. The processing duration for the drilling unit is Triangular for the threading unit is Uniform and for the coating unit is Triangular
Moreover, the resources capacity is different. From : to : the drilling unit has a capacity of three while the threading and coating units have capacity of two. Then, from : to : the drilling unit has a capacity of two while the threading and coating units have capacity of four.
The coating unit is prone to stochastic malfunctions. The pattern of these breakdowns is characterized by: operational duration sim exponential distribution, mean of hours and recovery duration exponential distribution, mean of minutes.
Mean Arrival rate per hour
Modeling Requirements:
Develop an ARENA model to simulate the described system for five days of hours shifts replications
Report the following results from the simulation:
Utilization of all resources.
Average total time in the system for the parts using recode module.
Average waiting time and average number in queue for all Queues.
Record the number of Parts & Avg. time in drilling unit and threading unit use two records
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock