Question: Table 3.5 An MSP Template for a LAN Installation Proiect. For the attached 14 tasks (categorized in 4 phases) create a PDM (AON) network diagram

Table 3.5 An MSP Template for a LAN Installation
Table 3.5 An MSP Template for a LAN Installation Proiect. For the attached 14 tasks (categorized in 4 phases) create a PDM (AON) network diagram and using the forward and backward passes, calculate the following two and answer here on D2L: 1) project duration 2) slacks for the tasks that are not on the Critical Path