Question: Task Predecessor Time (sec) 45 50 A B D E F G H 20 55 15 65 25 35 A A A D D E

Task Predecessor Time (sec) 45 50 A B D E F G H
Task Predecessor Time (sec) 45 50 A B D E F G H 20 55 15 65 25 35 A A A D D E B, C, F, G The process design team at a furniture manufacturer has broken an assembly process into eight basic steps, each with a required time and predecessor (if appropriate) as shown in the table. There are 7.5 productive hours (or 27,000 seconds) available in a day, and the manufacturer wishes to produce 500 units. Use this information to answer the following question: What is the theoretical minimum number of workstations needed if the line is balanced using the appropriate takt time? 4 6 O 7 5