Question: The average part produced in a certain batch manufacturing plant must be processed se . quechely through an average of tea operations. Twenty - five

The average part produced in a certain batch manufacturing plant must be processed se. quechely through an average of tea operations. Twenty-five new batches of parts are launched each week. Average operation time is 10 min, average setup time is 7.5 hr, averise batch size is 20 paris, and atiorage nonoperation time per batch is 12 hr per i bathe. There are 25 machines in the plant. Any machine can be set up for any type of batch processed in the plant. The plan operates 75 production hr/wk. Determine (a) perafacturing lead time for an average part, (b) plant capacity if all machines could be operated at 100% utilization, (c) plant utilization, and (d) work-in-process (number of plant utilization?
pars-in-process).

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!