The manufacturing engineers at a local facility were working on a new product. A production
consultant recommended that they use an assembly line. The workers in the plant work eight
hours per day. The task information for the new product is as follows and must be performed on
an assembly line in the sequence and times specified. There are minutes available during the
day, and the average daily demand has been units.
Task Task Time Second Task that must precede
A
B
C A
D C
E B C
F D
G E
H F G
a Draw a precedence diagram of the assembly line.
b What is the cycle time for this assembly line? Ans:
c What is the theoretical minimum number of stations? Ans:
d Assign tasks to workstations. Ans: AC; DF; BEG; H
e What is the idle time per cycle? ANS: seconds
f How much idle time is present each day? Ans: hours
g What is the overall efficiency of the assembly line? Ans: or
Posted Date: