Question: The MRP process of determining requirements for lower-level items based on the master production schedule is referred to as a) Lot sizing. b) Netting. c)
The MRP process of determining requirements for lower-level items based on the master production schedule is referred to as
a) Lot sizing.
b) Netting.
c) Backward scheduling.
d) Exploding