Question: The overall average on a process you are attempting to monitor is 60.0 units. The process population standard deviation is 1.72. Sample size is given
The overall average on a process you are attempting to monitor is 60.0 units. The process population standard deviation is 1.72. Sample size is given to be 4.
a) Determine the 3-sigma x-chart control limits.
Upper Control Limit (UCLx)=enter your response here units (round your response to two decimal places).
Lower Control Limit (LCLx)=enter your response here units (round your response to two decimal places).
b) Now determine the 2-sigma x-chart control limits.
Upper Control Limit (UCLx)=enter your response here units (round your response to two decimal places).
Lower Control Limit (LCLx)=enter your response here units (round your response to two decimal places).
How do the control limits change?
A. The control limits for the 2-sigma x-chart and for the 3-sigma x-chart are the same.
B. The control limits are tighter for the 3-sigma x-chart than for the 2-sigma x-chart.
C. The control limits are tighter for the 2-sigma x-chart than for the 3-sigma x-chart.