Question: The path through the activity network with the duration is called the path. Multiple Choice longest, bottleneck shortest, critical shortest, bottleneck longest, critical
The path through the activity network with the duration is called the
path.
Multiple Choice
longest, bottleneck
shortest, critical
shortest, bottleneck
longest, critical