Question: The path through the activity network with the q , duration is called the path. shortest, bottleneck longest, bottleneck shortest, critical longest, critical

The path through the activity network with the q, duration is called the path.
shortest, bottleneck
longest, bottleneck
shortest, critical
longest, critical
 The path through the activity network with the q, duration is