Question: The process batch at the constraint in a drum - buffer - rope system should be: Question 1 5 options: the same size as that

The process batch at the constraint in a drum-buffer-rope system should be:
Question 15 options:
the same size as that at any non-constraint.
the same size as the transfer batch.
of such a size as to maximize the number of setups for the constraint.
of such a size as to improve utilization of the constraint.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!