Question: The processing time and due dates for six jobs awaiting processing at the duty station are shown in the following table: Due Date Job 7

The processing time and due dates for six jobs

The processing time and due dates for six jobs awaiting processing at the duty station are shown in the following table: Due Date Job 7 Processing Time 2 8 A 16 B 4 4 17 10 D 15 5 E 18 12 F 12 7 G Required: Determine the job sequence, average time flow, average days late, and average number of jobs in a duty station according to each rule: (a) FCFS (b) SPT (c) DD (d) CR