Question: The production process in a cookie factory is shown below. There are four tasks performed in separate stations: i) mixing, ii) shaping, iii) baking, and
The production process in a cookie factory is shown below. There are four tasks performed in separate stations: i) mixing, ii) shaping, iii) baking, and iv) packaging. Each cookie needs to go through only one of the two of shaping machines and only one of the three baking ovens. The required processing time per cookie batch is given for each machine.
Station 1 Mix 6.5 mins/batch
Station 2 Shape 18 mins/batch; Shape 10 mins/batch
Station 3 Bake 17 mins/batch; Bake 14 mins/batch; Bake 35 mins/batch
Station 4 Pack 9.8 mins/batch
Which one is the bottleneck station and what is the hourly capacity in that station?
If the factory operates 16 hours per day, 6 days per week, what is the weekly capacity of this cookie factory?
The owner is considering to upgrade some equipment to replace one of the existing operations. Which operation should be considered first?