Question: The table below lists each work package with its duration and precedence description: Work package Duration (days) Predecessors 1.1 Demolition: remove all old appliances, cabinets,
The table below lists each work package with its duration and precedence description: Work package Duration (days) Predecessors 1.1 Demolition: remove all old appliances, cabinets, and flooring 3 None 1.2 Demolition: haul away all materials/debris 1 1.1 2.1 Order cabinets 2 1.2 2.2 Order sink/faucet 1 1.2 2.3 Order appliances 1 1.2 2.4 Order paint 2 1.2 3.1 Create countertop subcontract 1 2.1 & 2.2 & 2.3 3.2 Create tile subcontract 3 2.1 3.3 Create painting subcontract 1 2.4 4.1 Install cabinets 3 3.1 4.2 Install countertop 1 3.2 & 4.1 4.3 Install tile floors 4 4.2 4.4 Install sink/faucet 1 4.3 4.5 Install appliances 2 3.3 & 4.4 5.1 Paint walls & ceiling 4 4.5 6.1 PM Inspection/punchlist 1 5.1 6.2 Walk through / acceptance 1 6.1 Assignment: Network Diagram (Part 1) Use the information provided in this document to complete your Project Network diagram. Only complete the path using the Work Package titles, and AON arrow indicators. Network Diagram (Part 2) Add the Work package durations and complete the calculations to determine the ES (early start), EF (early finish), LS (late start), LF (late finish), and Slack in each work package box, as well as the total project duration and clearly identify the critical path.
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts