Question: The table below lists the work elements ( in minutes ) to be performed on an assembly line and the precedence requirements that must be

The table below lists the work elements (in minutes) to be performed on an assembly line and the precedence requirements that must be satisfied. Annual demand for the product will be 60,000 units. The line will operate one shift (2000 hr/yr). Expected line efficiency (proportion uptime) is 95%. Repositioning time per cycle is 6 sec. Manning level is 1.0 for all stations. The products will be moved through the line by conveyor at a speed of 4 ft/min. All stations are of equal length, which is 10 ft. Determine (a) theoretical minimum number of workers, (b) actual number of workers, based on previous experience with similar lines in which the highest possible balance efficiency is 93%,(c) tolerance time, and (d) elapsed time a product spends on the line from when it is first launched at the front of the first station until it is finally removed after the last station. (e) Construct the precedence diagram and (f) solve the line balancing problem using the Kilbridge and Wester method.3- The table below lists the work elements (in minutes) to be performed on an assembly line
and the precedence requirements that must be satisfied. Annual demand for the product
will be 60,000 units. The line will operate one shift (2000hryr. Expected line efficiency
(proportion uptime) is 95%. Repositioning time per cycle is 6sec. Manning level is 1.0 for
all stations. The products will be moved through the line by conveyor at a speed of 4ftmin.
All stations are of equal length, which is 10ft. Determine (a) theoretical minimum number
of workers, (b) actual number of workers, based on previous experience with similar lines
in which the highest possible balance efficiency is 93%,(c) tolerance time, and (d) elapsed
time a product spends on the line from when it is first launched at the front of the first
station until it is finally removed after the last station. (e) Construct the precedence diagram
and (f) solve the line balancing problem using the Kilbridge and Wester method.
 The table below lists the work elements (in minutes) to be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!