Question: this needs to turn in into a Network Diagram WBS Activity ID Activity Description Duration Successors General Conditions 0 2 A1000 A1010 A1020 A1030 A1040

this needs to turn in into a Network Diagram WBSthis needs to turn in into a Network Diagram

WBS Activity ID Activity Description Duration Successors General Conditions 0 2 A1000 A1010 A1020 A1030 A1040 A1050 A1060 4 10 A1010, A1020, & A1040 A1050 A1030 A1170 A1030 A1060 A1070 1 3 2 Site Work 5 2 3 A1070 A1080 A1090 A1100 A1110 A1120 A1130 A1140 3 2 1 2 4 Foundations 5 Notice to proceed (Milestone) Submit Bond/Insurance Obtain Permits Submit Preliminary Shop Dwgs. Submit Request for Payment Obtain/Clarify Right of Way Site Survey Soil Erosion BMP's Traffic Signage Clear & Grub Underground Utilities Temp Power Mobilize Remove Topsoil Bridge Layout Excavate for Bridge Suppors FRP Bridge Support Set Steel & Supports FRP Bridge Column Set Bridge Girders Install Metal Decking FRP Bridge Rails FRP Slab on Deck FRP Cable Stay Column Run Cables/Terminate Paint Bridge Metal Bridge Road Striping Re-route/Repair Road Final Paving Remove Signage Clean Site Landscape/Sod Punch List 4 2 A1150 A1160 A1170 A1180 A1190 A1200 A1210 A1220 4 Structure 10 A1080 A1090 A1130, and a SS(1) Lag with A1100 A1110 A1120 A1150 A1140 A1150 A1160 A1170 A1180 A1190 A1200 A1210 and A1220 A1230 and A1270 A1230 A1240 A1250 A1320, and SS(2) Lag w/A1260 A1320 A1280 A1290 A1300 A1310 A1320 end of project 4 5 4 A1230 8 6 Finish 5 2 A1240 A1250 A1260 A1270 A1280 A1290 A1300 A1310 A1320 4 2 2 2 2 7

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!