Question: Tim Assignment Data on small maintenance project is given as below: Depende Normal Activity Time A 57000 400 C SO A 200 F B 7

Tim Assignment Data on small maintenance project

Tim Assignment Data on small maintenance project is given as below: Depende Normal Activity Time A 57000 400 C SO A 200 F B 7 days SOO 1). Cost SNC 4 70 5 days day 50 On completion, the project will nive a return or silo/day. Using time-cost trade of method how much would you like to compress the project for maximizing the return? Show all RUN3 RUNN2 RUNR1 Initially TF Du Ds TF Du Ds TE Du DS TF CS CD ND Activity 0 50 4 A B 0 5 C D 50 25 50 100 0 0 2 5 0 2 E 6 4 5 8 10 7 3 6 7 4 4 5 7 5 3 5 4 100 25 F G H 1 cost Saving Project cost 150 110 110 110 6525 Project duration Direct cost=4325 Indirect cost-110.20-2200 Complete this table by draw first AON then determine critical path then try to crash the project as you can (Not necessary three time if you can more no problem,BUT I NEED solution by complete this table NOT in other way , Ds:- the activity that you want crashed for example if you want to crash the activity Hone time write DS=1 an like this way continue DU:-Duration TF:-total float Cs, cost slope ND:-normal time(duration ), CD:-crash time duration)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!