Question: Use this scenario for thefollowing question ( S ) . The process design team at a manufacturer has broken an assembly process intoe i g
Use this scenario for thefollowing questionS
The process design team at a manufacturer has broken an assembly process intoe i g n t basic steps, each with a required time,
and predecessor as shown inthe table. There are productivehours available in a day and the manufacturer wishes to
produce units. Use thisinformation to answer thefollowing questionS
T a s k
Time sec
r e d e c e s s o r
KL
P
Reter to the scenario above. What is the theoretical minimum number ot stations?
A seven
B four C five
DSiX