Question: Using Johnson's rule for 2-machine scheduling, the sequence is: Scheduled Order Job 1 C A F B E D Six jobs are to be processed
Using Johnson's rule for 2-machine scheduling, the sequence is:
Scheduled Order Job 1 C A F B E D Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows:
job. operation 1. operation 2
a. 12. 4
b. 8 11
c. 5 14
d. 6 2
e. 9 10
f. 3 1
Job Operation 1 (hours) Operation 2 (hours)
for the schedule, the total time taken to complete 6 jobs is?