Question: Using the work breakdown structure shown below, a typical work package would be: 1.0.0 S/W development 1.1.0 Systems design 1.1.1 H/W requirements 1.1.2 Flowcharting 1.2.0
Using the work breakdown structure shown below, a typical work package would be: 1.0.0 S/W development 1.1.0 Systems design 1.1.1 H/W requirements 1.1.2 Flowcharting 1.2.0 Coding 1.2.1 Language selection