Question: What is the PERT time (Te) with optimistic, most likely, and pessimistic time estimations of 8, 10, 12 days 0 5 O 10 07 O

 What is the PERT time (Te) with optimistic, most likely, and

What is the PERT time (Te) with optimistic, most likely, and pessimistic time estimations of 8, 10, 12 days 0 5 O 10 07 O 12