Question: When a scheduling and production system is running at or below capacity, lead time and throughput time are the same. True False As the quality

When a scheduling and production system is running at or below capacity, lead time and throughput time are the same.
True
False
As the quality goes high, the production cost also increases
True
False
In push system, because the production was carefully planned, it wasinherently easier to control.
True
False
The time required to complete one process is called:
Running time.
Setup time.
None of them
Takt time.
Cycle time.
Which of the following statements is best for the visual control?
Anyone can identify when waste is present.
None of them
The bottleneck machine problem will be solved.
Material flow will be much smoother.
The distance material has to travel will be much shorter.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!