Question: When using SPC techniques for quality control, a shift in the process mean or central tendency of a measured variable would be best detected by
- When using SPC techniques for quality control, a shift in the process mean or central tendency of a measured variable would be best detected by a:
- P-chart
- X-bar chart
- C-chart
- R-chart
- S-chart
- Which of the following is an example of a strategic responsibility of supply chain management?
- Inventory management
- Operations planning
- Vendor sourcing
- Transportation planning
- Configuration of networks and facilities
- For inventory management, which of the following is not one of the assumptions of the basic economic order quantity (EOQ) model?
- Annual demand requirements are known and constant
- Lead time does not vary
- Each order is received in a single delivery
- Quantity discounts are available
- All of the above
- For inventory management, which of the following is not a determinate of the basic reorder order point model?
- Rate of demand
- Lead time for delivery or production
- Variability of demand and/or lead time
- Degree of acceptability of stockouts
- Cost of inventoried item
- Aggregate planning for a business seeks to balance:
- Market demand and inventories
- Market demand and costs
- Inventories and capacity
- Costs and capacity
- Market demand and capacity
- A computer- based information system designed to manage production involving dependent demand inventories is:
- Computer aided manufacturing (CAM)
- Computer integrated manufacturing (CIM)
- Economic order quantity (EOQ) model
- Material requirements planning (MRP)
- Economic run size (ERS)
- MRP systems translate the _______ into time-phased requirements for components.
- Master schedule
- Bill of materials
- Inventory records
- Assembly time chart
- Net- Requirements chart
- Which of the following is not a supporting goal or building block element for achieving a lean operation?
- Eliminate disruptions
- Make system flexible
- Eliminate waste
- Close vendor/supplier relationships
- Access to capital
- In project management, __________ an activity involves shortening the time it will take to complete the activity by increasing resources allocated to it.
- Hammering
- Expediting
- Crashing
- Hitting
- Speeding
- When using network diagrams for project management, the sequence of activities that has no slack time is called _________.
- Critical path
- Fast lane
- Priority trail
- Critical sequence
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
