Question: Which two terms reflect the scheduling in the job shops? a . Line balancing and flow control. b . Assignment Method and Appointment. c .
Which two terms reflect the scheduling in the job shops?
a Line balancing and flow control. b Assignment Method and Appointment.
c Gantt chart and runout time. d Loading and Sequencing.
If an activity has a zero slack time, it:
a means the project is expected to delayed. b must be a dummy activity.
c is on the critical path. d all are correct