Question: Which two terms reflect the scheduling in the job shops? a. Line balancing and flow control. b. Assignment Method and Appointment. c. Gantt chart and

Which two terms reflect the scheduling in the job shops? a. Line balancing and flow control. b. Assignment Method and Appointment. c. Gantt chart and run-out time. d. Loading and SequencingIf an activity has a zero slack time, it: a. means the project is expected to delayed. b. must be a dummy activity. c. is on the critical path. d. all are correct