Question: Wi 1 0 Traffic flow for a four - legged intersection is as shown in following figure. Given that the lost time per phase is
Wi Traffic flow for a fourlegged intersection is as shown in following figure.
Given that the lost time per phase is seconds, saturation headway is
seconds, amber time is seconds per phase, find the cycle length, green
time. Assume critical vc ratio as
Phase plan