Question: To assemble the plastic chair (shown below using an assembly line, the following activities with estimated standard times are required. a. Draw a precedence for

To assemble the plastic chair (shown below using an assembly line, the following activities with estimated standard times are required.
To assemble the plastic chair (shown below using an assembly

a. Draw a precedence for this assembly.
b. If the desired output rate of the assembly line is 120 chaires per hour, what is the minimum number of workstations required?
c. Using a cycle time of 30 second per chair, and Assign the task with the longest time€ heuristic rule, design the assembly line (i,e., balance the line).

Left side Back Seat Bottom rung Bottom rack Right side

Step by Step Solution

3.55 Rating (166 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a Precedence network b CT ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (1 attachment)

Word file Icon

686-B-M-L-O-M (4795).docx

120 KBs Word File