Question: To assemble the plastic chair (shown below using an assembly line, the following activities with estimated standard times are required. a. Draw a precedence for
.png)
a. Draw a precedence for this assembly.
b. If the desired output rate of the assembly line is 120 chaires per hour, what is the minimum number of workstations required?
c. Using a cycle time of 30 second per chair, and Assign the task with the longest time€ heuristic rule, design the assembly line (i,e., balance the line).
Left side Back Seat Bottom rung Bottom rack Right side
Step by Step Solution
3.55 Rating (166 Votes )
There are 3 Steps involved in it
a Precedence network b CT ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
686-B-M-L-O-M (4795).docx
120 KBs Word File
