Question: Daily demand for an item is shown here. Assume a holding cost of $0.50 per unit per day, a setup cost of $100 per setup,
Daily demand for an item is shown here. Assume a holding cost of $0.50 per unit per day, a setup cost of $100 per setup, a lead time of one day and 70 units on hand. Determine when a work order should be released for the item and the size of the order using the L4L, EOQ, and POQ lot sizing techniques. Which technique produces the lowest totalcost?
.png)
1 2 3 4 5 6 7 8 9 10 Gross Requirement 50 30 25 35 40 50 35 45 70 75 rio
Step by Step Solution
3.40 Rating (166 Votes )
There are 3 Steps involved in it
10000 Exact Rounded 050 13491 135 4550 296 3 Item X LLC 1 Period Lot Size L4L 1 LT 1 1 2 3 4 5 6 7 8 ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
184_6075669f968eb_143306.xlsx