Question: A work - study sample of a manufacturing activity conducted over a 4 0 - hour period shows that a worker with an 8 5
A workstudy sample of a manufacturing activity conducted over a hour period shows that a worker with an rating produced parts. The worker's idle time was and the allowance factor was Find the standard time per part for this activity given the allowance is added to its normal time.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
