Question: How many machines should be assigned to an operator for lowest cost operations when: a. Loading and unloading time one machine, 1.41 minutes. b. Walking
a. Loading and unloading time one machine, 1.41 minutes.
b. Walking time to next facility, 0.08 minutes.
c. Machine time (power feed), 4.34 minutes.
d. Operator rate, $13.20 per hour.
e. Machine rate, $18.00 per hour.
.png)
LosdingkUrkera 1) 1.41 Wakala Hour Won K1) 192 + Mahim Aumig H| 434 Shom Raua MotireHouly Cod (2) 1.6 Woting Tim othe than L MI .06 Pin |1 ti Mactires Lagend 5.75 Gch Time hin) Londrg Lbadng Production (unihu Total Expecied Cnat 31.3 wuk woking Nachine Aunhg *d Machres Prodcion (unihu Totl Expecied Dat pe uri 1 Ide Time .18
Step by Step Solution
3.43 Rating (169 Votes )
There are 3 Steps involved in it
N 1 l m l w 141 434 141 08 3859 TEC 3 l m K 1 ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
1439-B-H-R-M-E-R(263).docx
120 KBs Word File