Question: Product A is assembled from one B and two Cs. Each item requires one or more operations, as indicated by the circles in the product
a. Develop a load profile chart for each of the three work centers.
b. Level the loads. Discuss possible consequences of shifting work to otherperiods.
.png)
40 30 20 10 MASTER PRODUCTION SCHEDULE Product A 100 150 100 200 100 100 ROUTING AND WORK STANDARDS FILE Standard Time Work Center Machining Heat treat Machining Assembly Item per Unit (hr) 0.50 2.00 1.00 0.40 20 30
Step by Step Solution
3.40 Rating (162 Votes )
There are 3 Steps involved in it
Requirements Matrix Item 1 2 3 4 5 6 Product A 100 150 100 200 100 100 ... View full answer