Question: Product A is assembled from one B and two C s . Each item requires one or more operations, as shown below. The MPS is

Product A is assembled from one B and two Cs. Each item requires one or more operations, as shown below.
The MPS is given below:
\table[[Period,1,2,3,4,5,6],[Product A,100,150,100,200,100,100]]
The routing and work standard file:
\table[[Operation,Item,Work Centre,\table[[Standard time per],[unit (hr)]]],[10,C,Machining,0.50],[20,C,Heat treat,2.00],[30,B,Machining,1.00],[40,A,Assembly,0.40]]
a. Complete the requirement matrix and load profile chart for each work center.
Requirements Matrix
\table[[Item,1,2,3,4,5,6
 Product A is assembled from one B and two Cs. Each

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!