For the cumene problem in Section 24. 4, it has been determined that the feed is off

Question:

For the cumene problem in Section 24. 4, it has been determined that the feed is off specification. Until a new propylene supplier can be contracted with, the propylene from the current supplier will have to be used. Tests have shown that this propylene can be expected to have between 5 \(\mathrm{wt} \%\) and \(10 \mathrm{wt} \%\) propane impurity. It has been decided to try to maintain the design cumene production rate by increasing the propylene feed rate so that a constant, design amount of propylene enters the reactor. Identify the bottlenecks to the proposed process change.

Debottleneck this situation.

Data from section 24.4

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed


Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  answer-question

Analysis Synthesis And Design Of Chemical Processes

ISBN: 9780132618120

4th Edition

Authors: Richard Turton, Richard C. Bailie, Wallace B. Whiting, Joseph A. Shaeiwitz, Debangsu Bhattacharyya

Question Posted: