An article in Advanced Semiconductor Manufacturing Conference (ASMC) (May 2004, pp. 32529) stated that dispatching rules and

Question:

An article in Advanced Semiconductor Manufacturing Conference (ASMC) (May 2004, pp. 325€“29) stated that dispatching rules and rework strategies are two major operational elements that impact productivity in a semiconductor fabrication plant (fab). A four-factor experiment was conducted to determine the effect of dispatching rule time (5 or 10 min), rework delay (0 or 15 min), fab temperature (60 or 80°F), and rework levels (level 0 or level 1) on key fab performance measures. The performance measure that was analyzed was the average cycle time. The experiment was blocked for the fab temperature. Data modified from the original study are in the following table.

Average Cycle Rework Temperature TimeRun (min) Dispatching Rework Rule Time Delay (min) (min) Fab (

(a) What effects are confounded with blocks? Do you find any concerns with confounding in this design? If so, comment on it.

(b) Analyze the data and draw conclusions.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Applied Statistics And Probability For Engineers

ISBN: 9781118539712

6th Edition

Authors: Douglas C. Montgomery, George C. Runger

Question Posted: