New Semester
Started
Get
50% OFF
Study Help!
--h --m --s
Claim Now
Question Answers
Textbooks
Find textbooks, questions and answers
Oops, something went wrong!
Change your search query and then try again
S
Books
FREE
Study Help
Expert Questions
Accounting
General Management
Mathematics
Finance
Organizational Behaviour
Law
Physics
Operating System
Management Leadership
Sociology
Programming
Marketing
Database
Computer Network
Economics
Textbooks Solutions
Accounting
Managerial Accounting
Management Leadership
Cost Accounting
Statistics
Business Law
Corporate Finance
Finance
Economics
Auditing
Tutors
Online Tutors
Find a Tutor
Hire a Tutor
Become a Tutor
AI Tutor
AI Study Planner
NEW
Sell Books
Search
Search
Sign In
Register
study help
business
construction project management
Management Of Construction Projects A Constructors Perspective 2nd Edition Len Holm, John E. Schaufelberger - Solutions
What is a phased project-specific accident prevention plan? Why is it prepared?
What are safety data sheets? Why are they used on construction sites?
What is a hazardous materials communication program? Why does OSHA require its use?
What are four types of PPE that are commonly used on construction projects?
How are substance abuse programs in the construction industry typically administered?
Why is substance abuse an important safety issue on a construction jobsite?
What are three ways to reduce the risk created by a hazard on a jobsite?
What is the purpose of a job hazard analysis? What three elements are involved in the analysis?
What are four costs that can result from a construction site accident that typically are not covered by insurance?
Why is jobsite safety a significant project management issue?
What is OSHA’s role in safety management on construction sites?
What are the four prime causes of injuries on construction projects?
List five examples of passive safety control and five examples of active safety control.
Which construction trade is likely to have a higher worker’s compensation base rate:steel erector or landscaper?drywall installer or roofer?carpet installer or high voltage electrician?
What can you tell about a general contractor who has an EMR of 1.8? 0.4?
Develop the section of the phased accident prevention plan for the NanoEngineering Building project that covers the early site preparation phase of the project.
Develop a substance abuse policy letter for the NanoEngineering Building project.
Prepare a job hazard analysis for the construction of the roofing on the NanoEngineering Building project.
What is a pre-final inspection, and when is it conducted?
What is the purpose of an initial inspection?
What is the purpose of a pre-inspection?
Why are materials that are stored on site periodically inspected?
Why should subcontractors not be allowed to build over work that was improperly done by a previous subcontractor?
Why should QC inspectors be involved in the submittal process?
What are mock-ups, and why are they used?
Why are project-specific QC plans needed? Why are generic QC plans not acceptable?
What four processes are used in managing quality on a construction project?
What is the primary objective of active quality management programs?
List five examples each of active and passive quality control.
Develop a QC checklist for gypsum board assemblies for the NanoEngineering Building, making reference to the technical specifications.
Develop a QC checklist for the concrete columns or another significant assembly for the NanoEngineering Building, making reference to the technical specifications.
What are two mock-ups the general contractor should require subcontractors to construct for the NanoEngineering Building?
What QC organization do you recommend the contractor use on the NanoEngineering Building?
What would the cost codes be on the NanoEngineering Building forCarpet?Concrete placement?Reinforcing steel purchase?
What is an earned value analysis used for?
What are as-built schedules used for?
What are as-built estimates used for?
How frequently should a project manager develop a forecast of the estimated cost to complete a project?
Other than the examples listed earlier, what three typical assemblies or systems would warrant development of a foreman’s work package?
What is a foreman’s work package cost control work sheet used for?
What are project labor curves used for?
Why are cost codes used for monitoring actual project costs?
What three types of project costs present the greatest risk to the project team?
Why is the original cost estimate corrected based on buyout data?
What are four uses of actual project cost data?
Referring to Figures 12.3 and 12.4 earned value curves, if each of these work packages proceeds at the same trend, when will they complete, and what will be the final hours over or under budget?
Prepare a list of the top ten systems or assemblies from the NanoEngineering Building which deserve the most cost control attention and fall within the 80–20 rule.
Prepare additional earned value curves starting with the footing work package example presented earlier in the chapter. Draw a curve where the foreman is over budget and behind schedule and another where the team is on budget and ahead of schedule. Prepare a narrative explaining why these
Prepare a cost forecast for the foregoing work activities. Based upon the work-packages developed, forecast the remaining hours needed and calculate the total over- or under-run this system will achieve.Convert the hours to dollars using wage rates from Chapter 3 or other local current rates. List
Utilizing another case study project, prepare a work package for direct labor for a system of work such as concrete foundations, cast-in-place concrete walls, tilt-up concrete walls, or slab-on-grade. Attach the original portion of the estimate that refers to this work package. Assume the following
How can slow payments from the owner affect the financial stability of a contractor?
Why are final lien releases requested by owners as part of the final payment process?
What are interim lien releases used for?
What is the relationship between a payment bond (Chapter 2) and a lien?
What is a lien?
What is retention? What is it used for?
What type of data is submitted to support a payment request on a lump sum contract?
What type of data is submitted to support a payment request on a negotiated open-book contract?
What is an SOV? Why is it required by project owners?
How does the type of contract influence the format of the payment request?
We do not advocate this but, for comparison, prepare a lump sum SOV for the NanoEngineering Building example except aggressively front load the general conditions and fee and other markups. How would this change the cash flow curves presented previously in Chapter 4?
Prepare a pay request for the month ending January 2016 (or any other chosen month) for the NanoEngineering Building, including all supporting documentation and lien releases. Assume the project is on schedule.
Prepare an SOV similar to the one shown in Worksheet 11.3, except for another sample case study project, such as a middle school, hotel, or office building.
What advantages do web-based project management systems offer over computer-based project management systems?
Do all RFIs result in change orders?
Are verbal RFI responses sometimes acceptable? If so, how should they be ultimately documented?
Who should prepare an RFI?
When is the RFI log reviewed?
Why do some designers welcome RFIs?
Why do some designers resist RFIs?
Why are RFIs used on construction projects?
When should the meeting notes be distributed and why?
What documents should be attached to the meeting notes and why?
Where should the project manager sit at a meeting?
List five uses of meeting notes.
Who on the project management team is responsible for the accuracy of the OAC coordination meeting notes?
Who on the project management team is often responsible for preparation of meeting notes?
Who should chair the weekly jobsite safety meeting?
What is the most common form of written communication document?
List five types of written communication tools.
Assume you found a conflict in the drawings for the NanoEngineering Building. The finish schedule on Drawing A10.01-TI shows the walls of conference room 291 to be off-white, but the interior elevation shown in Drawing A7.05-TI shows the walls to be light green, which will be more expensive and
As the roofing subcontractor on the NanoEngineering Building, prepare an RFI asking for direction regarding the curbs and flashing around mechanical penetratons. Refer to appropriate drawings and specifications. Include the time when you need a response.
Prepare a set of meeting notes for your classroom discussion as if it were a construction meeting.
Prepare a telephone memorandum of a conversation between the project manager and the electrical subcontractor on the NanoEngineering Building confirming the scheduled delivery of electrical switch gear. Refer to schedules located in other parts of this text and on the companion website.
Prepare a transmittal for Northwest Construction Company to submit its monthly request for payment to the owner of the NanoEngineering Building. Refer to Chapter 11.
List three types of record drawings.
How are as-built drawings created?
How would it be possible for different members of the team to be working off different revisions of construction drawings?
Why would it be important for a document-control log to be up to date?
List three different types of logs
List three misuses of a diary.
Who should originate a diary?
List at least five important types of information that is recorded on a daily job diary.
What is a journal or daily report?
How long are files kept in storage?
Where should the project files be located?
The file code system on a jobsite should be similar to what other code systems?
Which member of the construction team is responsible for mobilizing the paper flow?
Which member of the construction team is responsible for physically mobilizing onto the jobsite?
Create a typical job diary for the NanoEngineering Building for the following dates. Use the project schedule on the website for reference. Make any reasonable assumptions:January 21, 2016 (a snowy day);August 21, 2016 (a clear day).