Question: Repeat 4.23.1 for the 2-bit predictor. Exercise 4.23.1 Stall cycles due to mispredicted branches increase the CPI. What is the extra CPI due to mispredicted

Repeat 4.23.1 for the 2-bit predictor.

Exercise 4.23.1

Stall cycles due to mispredicted branches increase the CPI. What is the extra CPI due to mispredicted branches with the always-taken predictor? Assume that branch outcomes are determined in the EX stage, that there are no data hazards, and that no delay slots are used.


The importance of having a good branch predictor depends on how often conditional branches are executed. Together with branch predictor accuracy, this will determine how much time is spent stalling due to mispredicted branches. In this exercise, assume that the breakdown of dynamic instructions into various instruction categories is as follows:a. b. a. R-Type b. 40% 60% BEQ 45% 65% 25% 8% Also, assume the following branch predictor accuracies:

a. b. a. R-Type b. 40% 60% BEQ 45% 65% 25% 8% Also, assume the following branch predictor accuracies: Always-Taken JMP 5% 2% Always-Not-Taken 55% 35% LW 25% 20% 2-Bit 85% 98% SW 5% 10%

Step by Step Solution

3.48 Rating (161 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To determine the extra CPI Cycles Per Instruction owing to mispredicted branches with a 2bit branch ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Computer Organization Design Questions!