Question: Level the resources for a project with the workload diagram below. In the timephased diagram at the top of the diagram, dotted lines indicate slack.8

Level the resources for a project with the workload diagram below. In the timephased diagram at the top of the diagram, dotted lines indicate slack.8 Discuss pros and cons of the alternatives available.15+ AB D E H I J + G F G 10-

15+ AB D E H I J + G F G 10- Number of workers F 5+ D B J E C H A 2 4 6 8 10 Weeks