Question: Five observations from a work measurement study are shown below. Continuous timing was not used, but the times in minutes for each work element were

Five observations from a work measurement study are shown below. Continuous timing was not used, but the times in minutes for each work element were recorded individually. Assume a total allowance of 20 percent. Use the Work Measurement Excel template to determine the standard time for this operation.Work Element Get casting Load in fixture Drill Unload Inspect Place in

Work Element Get casting Load in fixture Drill Unload Inspect Place in bin 1 0.21 0.27 1.04 0.21 0.25 0.12 2 0.21 0.28 1.06 0.18 0.26 0.11 Observation 3 0.21 0.25 1.00 0.25 0.24 0.10 4 0.20 0.25 1.04 0.22 0.25 0.13 5 0.25 0.27 1.04 0.20 0.20 0.12 Performance Rating 0.95 0.90 1.00 0.95 0.80 1.10

Step by Step Solution

3.47 Rating (163 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To use the template students must first compute cumulative ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operations And Supply Chain Management Questions!