Observation
Work Element 12345 Performance Rating
Get casting 0.230.230.230.200.271.05
Load in fixture 0.270.300.250.250.271.10
Drill 1.061.081.001.061.060.80
Unload 0.240.190.280.240.220.95
Inspect 0.270.260.250.270.220.80
Place in bin 0.150.140.100.130.151.05