Question: Draw the node network for the following project and perform the CPM calculations: Activity Duration IPAES EF LS LF TF FF A 7 B 10
Draw the node network for the following project and perform the CPM calculations:
Activity Duration IPAES EF LS LF TF FF A 7 —B 10 —C 15 A D 8 A, B E 4 C, D 7.31