Question: Draw the node network for the following project and perform the CPM calculations: Activity Duration IPAES EF LS LF TF FF A 6 B 2
Draw the node network for the following project and perform the CPM calculations:
Activity Duration IPAES EF LS LF TF FF A 6 —B 2 —C 8 A D 5 A, B E 3 B F 6 D, E G 5 C, D H 2 F, G 7.33