Question: 1) What happens as we change batch sizes 2) What batch size will maximize capacity while minimizing the associated flowtime? Fill in the remainder of

1) What happens as we change batch sizes
2) What batch size will maximize capacity while minimizing the associated flowtime?
Fill in the remainder of the Chart and answer questions on slide 2 Task 1 Task 3 Task 2 (Bob) 0 (Adam) 45 (Charles) 20 Setup time (mins): Time per unit (mins): 0.5 2 1 Capacity (in flow units per hour) Batch size = 10 Batch size = 30 Batch size = 60 Adam Bob Time = 10*.5+45=50 min/batch=1.2b/hr=1.2*1 0= 12units/hr Time = 10*2=20/b =3b/hr*10=30/hr Time =10*1+20=30mins/b=2 b/hr*10=20/hr Charles Bottleneck(s) Adam Process Cap 12/hrStep by Step Solution