Question: 2 2 - 3 . A full actuated signal is to be installed at the major ( c ) Compute yellow and all - red

22-3. A full actuated signal is to be installed at the major
(c) Compute yellow and all-red times.
intersection shown in Figure 22.10. It is planned to use
60-foot presence detectors with their front edges
located 2 feet from the STOP line. For this location and
the conditions shown:
(d) Recommend maximum green times for each phase.
(e) What is the critical cycle length?
(f) Are pedestrian signals and/or pushbuttons needed
(a) Recommend minimum green times and detector
for any phases?
placement locations.
(b) Recommend a passage time.
Figure 22.10: Intersection for Problem 3
2 2 - 3 . A full actuated signal is to be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!