Question: 2 . 8 A worker is responsible for loading and unloading a production machine. The load / unload elements in the repetitive work cycle have

2.8 A worker is responsible for loading and unloading a production machine. The load/unload elements in the repetitive work cycle have a normal time of only 24sec, and the machine cycle time is 2.83min. One part is produced each cycle. Every sixth cycle, the operator must replace the tote pans of parts, which takes 2.40min (normal time). For setting the standard time, the PFD allowance factor is 15% and the machine allowance factor is 15%. Determine the standard time under the following alternative assumptions: (a) the irregular element is performed as an extemal element and (b) the irrefjular element is performed as an internal
 2.8 A worker is responsible for loading and unloading a production

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!