Question: A worker is responsible for loading and unloading a production machine. The load / unload elements in the repetitive work cycle have a normal time
A worker is responsible for loading and unloading a production machine. The loadunload elements in the repetitive work cycle have a normal time of only sec and the machine cycle time is min. One part is produced each cycle. Every th cycle, the operator must replace the tote pans of parts, which takes min normal time For setting the standard time, the PFD allowance factor is and the machine allowance factor is Determine the standard time under the following alternative assumptions:the irregular element isperformed as an external element.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
