Question: 2: Determine the project duration for the following table using Bar chart. Activity Preceded by Duration (days) A 1.5 A 1.5 C A 2.5
2: Determine the project duration for the following table using Bar chart. Activity Preceded by Duration (days) A 1.5 A 1.5 C A 2.5 D 1 E C,D 1.5 F D 1 G F 3.5 H 1 I G 0.5 J 1
Step by Step Solution
3.43 Rating (150 Votes )
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
Document Format (2 attachments)
635d660613a60_175221.pdf
180 KBs PDF File
635d660613a60_175221.docx
120 KBs Word File
