Question: 2: Determine the project duration for the following table using Bar chart. Activity Preceded by Duration (days) A 1.5 A 1.5 C A 2.5

2: Determine the project duration for the following table using Bar chart.

2: Determine the project duration for the following table using Bar chart. Activity Preceded by Duration (days) A 1.5 A 1.5 C A 2.5 D 1 E C,D 1.5 F D 1 G F 3.5 H 1 I G 0.5 J 1