Question: 2. Draw an activityr chart for a machine operator with the following operation. The relevant times are as follows: Prepare mill for loading (cleaning, oiling,

 2. Draw an activityr chart for a machine operator with the
following operation. The relevant times are as follows: Prepare mill for loading

2. Draw an activityr chart for a machine operator with the following operation. The relevant times are as follows: Prepare mill for loading (cleaning, oiling, and so on} 0.50 min Load mill 1.?5 min Mill operating [cutting material} 2.25 min Upload mill (IFS min {You may not have experience with this. Read the suggested solution for to get the idea}