Question: OC. D. Time Time Machine Time Time Operator Time Machine Time Operator Prepare Mill 0 0 Prepare Mill 1 1 Load Mill 1 1 1

OC. D. Time Time Machine Time Time Operator TimeOC. D. Time Time Machine Time Time Operator TimeOC. D. Time Time Machine Time Time Operator Time

OC. D. Time Time Machine Time Time Operator Time Machine Time Operator Prepare Mill 0 0 Prepare Mill 1 1 Load Mill 1 1 1 Idle 1 Idle Load Mill U 2 2 2 2 - 2 3 3 3 3 3 Idle Mill Operating (Cutting Material) Idle Mill Operating (Cutting Material) 4 4 4 4 4 Unload Mill 5 Idle 5 5 5 5 - Unload Mill Idle TTTT 6 6 6 6 6 OA. B. Time Time Machine Time Time Time Machine Time Operator Prepare Mill Operator Prepare Mill 2 Idle 1 1 1 1 Idle Load Mill Load Mill 2 2 2 2 Mill Operating (Cutting Material) 3 3 3 3 3 Idle Idle Mill Operating (Cutting Material) 4 4 4 4 4 5 Unload Mill 5 Idle 5 5 Unload Mill 5 Idle 6 6 6 6 Draw an activity chart for a machine operator with the following operation. The relevant times are as follows: Prepare mill for loading (cleaning, oiling, and so on) Load mill Mill operating (cutting material) Unload mill 0.50 min 1.75 min 2.25 min 0.75 min Plot all required processes and their relevant times on the chart. Choose the correct graph below

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!